The roof of a two-story office building collapsed during a severe rainstorm. The impact from the collapsing roof progressively caused the second floor to also collapse onto the first floor…
This case involved a building which had been recently converted from a gas station into a café. A 2 inch rainfall occurred shortly after the conversion was completed, and caused…
On April 17, 2013, an explosion at the West Fertilizer Company in West, Texas rocked the city and surrounding rural areas. The explosion left a crater 93′ wide and 10′…
While roof collapses are not uncommon, this case was unique, as the steel joist roof framing collapsed along the entire 900 foot length of one perimeter wall. Nelson’s engineers responded immediately,…
The 83,000 square foot steel-framed membrane-envelope building housed a full-size football field and observation areas; and it collapsed during a windstorm with maximum wind speeds of 55 mph. Nelson’s team…
A two-span pedestrian bridge which connected the second floor of a shopping mall with the adjacent parking garage collapsed. The bridge was constructed of wide-flange steel fascia girders, transverse floor…
Two years after construction of the $60,000,000, 18,000 seat Eagle Stadium in Allen, Texas was completed, Nelson was retained to evaluate unusual cracking at the elevated, reinforced concrete concourse level….
A highway bridge collapsed while in service. The bridge was a 1940’s era reinforced concrete multi-arch superstructure supported by wide-flange steel columns. Nelson’s engineers documented the collapse and the structural…